BRITISH SECTION ESTIMATE
Item DESCRIPTION Quantity Unit Rate AMOUNT Work One 60ft. girder at Chain 9:961, Drywing C.R.E. No.10371. $ Cts. 81 Excavation in founda. 30000 cub. ft. 10 300 00. Timbering and pumping. 500 00. Concrete in founds. 3800 cub. ft. 35% 1330 00. Masonry in Portions. 4100 cub. ft. 40/ 1640 00. Masonry in Superstructure. 23530 cub. ft. 40 $420 00. Coping and Redstones, Drystone at back of abuts. 240.ft. $30 7150 VI One 60 ft. Girder landed in Kowloon. One 3500 00. One 60 ft. Carriage to site erection and painting. 500 00. Total 20421 Contingencies 10% 2342 00. Grand Total $25764 60.08
.gewlibЯ notne moolwod
.TZUOMÉ
-10
1:
*
OD
00
DI
0/0.02
„KOITO32 HEITIЯa
.3TAMIT23
C.K.E. No. 24.
Kowloon Canton Railway.
bash ninM
best duż
Main Head
Sub. Head
BRITIES.
Major No.6.
#bi
bool volt P
„Beef an
BRITISH SECTION
ESTIMATE,
Work One 60ft. firder at Chain 9:961, Drywing C.R.E. No.10371.
Quantity.
DESCRIPTION.
81
AMOUNT.
Rate.
Unit.
$
Cts.
30000
Exoavation in founda.
10 ort
300
500
00.
00.
Item.
Timbering and pumping.
+3800
Concrete in founds.
35% art
4830
00.
י
4100
Masonry in Portines.
40/
1640
00.
23530
Masonry in Superstruoture.
40
$420 00.
240.ft.
$30
7150
Coping and Redstones,
Drystone at back of abuts.
10, Foort
660 00.
71
40.
3500 00.
VI
One
60 ft. Girder landed in Kowloon.
One
60 ft. Carriage to sito erection and painting.
500 00.
07
[SA, AL
x at 1
BAC,C
Les act
I>
Ok sex
22
!
TA
01 zaloniynine)
IntoT bagD
Total
Contingincies 10%
Grand Total
20421
2342
00.
10
$25764 60.