C.K.E. No. 24.

Kowloon Canton Railway.

Main Head

Sub. Head

BRITISH

Major No.6.

BRITISH SECTION ESTIMATE

Item DESCRIPTION Quantity Unit Rate AMOUNT Work One 60ft. girder at Chain 9:961, Drywing C.R.E. No.10371. $ Cts. 81 Excavation in founda. 30000 cub. ft. 10 300 00. Timbering and pumping. 500 00. Concrete in founds. 3800 cub. ft. 35% 1330 00. Masonry in Portions. 4100 cub. ft. 40/ 1640 00. Masonry in Superstructure. 23530 cub. ft. 40 $420 00. Coping and Redstones, Drystone at back of abuts. 240.ft. $30 7150 VI One 60 ft. Girder landed in Kowloon. One 3500 00. One 60 ft. Carriage to site erection and painting. 500 00. Total 20421 Contingencies 10% 2342 00. Grand Total $25764 60.

Edit History

2026-06-04 21:18:29 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
C.K.E. No. 24. Kowloon Canton Railway. Main Head Sub. Head BRITISH Major No.6. BRITISH SECTION ESTIMATE Item DESCRIPTION Quantity Unit Rate AMOUNT Work One 60ft. girder at Chain 9:961, Drywing C.R.E. No.10371. $ Cts. 81 Excavation in founda. 30000 cub. ft. 10 300 00. Timbering and pumping. 500 00. Concrete in founds. 3800 cub. ft. 35% 1330 00. Masonry in Portions. 4100 cub. ft. 40/ 1640 00. Masonry in Superstructure. 23530 cub. ft. 40 $420 00. Coping and Redstones, Drystone at back of abuts. 240.ft. $30 7150 VI One 60 ft. Girder landed in Kowloon. One 3500 00. One 60 ft. Carriage to site erection and painting. 500 00. Total 20421 Contingencies 10% 2342 00. Grand Total $25764 60.
Baseline (Original)
08 .gewlibЯ notne moolwod .TZUOMÉ -10 1: * OD 00 DI 0/0.02 „KOITO32 HEITIЯa .3TAMIT23 C.K.E. No. 24. Kowloon Canton Railway. bash ninM best duż Main Head Sub. Head BRITIES. Major No.6. #bi bool volt P „Beef an BRITISH SECTION ESTIMATE, Work One 60ft. firder at Chain 9:961, Drywing C.R.E. No.10371. Quantity. DESCRIPTION. 81 AMOUNT. Rate. Unit. $ Cts. 30000 Exoavation in founda. 10 ort 300 500 00. 00. Item. Timbering and pumping. +3800 Concrete in founds. 35% art 4830 00. י 4100 Masonry in Portines. 40/ 1640 00. 23530 Masonry in Superstruoture. 40 $420 00. 240.ft. $30 7150 Coping and Redstones, Drystone at back of abuts. 10, Foort 660 00. 71 40. 3500 00. VI One 60 ft. Girder landed in Kowloon. One 60 ft. Carriage to sito erection and painting. 500 00. 07 [SA, AL x at 1 BAC,C Les act I> Ok sex 22 ! TA 01 zaloniynine) IntoT bagD Total Contingincies 10% Grand Total 20421 2342 00. 10 $25764 60.
2026-06-04 21:18:29 · Baseline
View content

08

.gewlibЯ notne moolwod

.TZUOMÉ

-10

1:

*

OD

00

DI

0/0.02

„KOITO32 HEITIЯa

.3TAMIT23

C.K.E. No. 24.

Kowloon Canton Railway.

bash ninM

best duż

Main Head

Sub. Head

BRITIES.

Major No.6.

#bi

bool volt P

„Beef an

BRITISH SECTION

ESTIMATE,

Work One 60ft. firder at Chain 9:961, Drywing C.R.E. No.10371.

Quantity.

DESCRIPTION.

81

AMOUNT.

Rate.

Unit.

$

Cts.

30000

Exoavation in founda.

10 ort

300

500

00.

00.

Item.

Timbering and pumping.

+3800

Concrete in founds.

35% art

4830

00.

י

4100

Masonry in Portines.

40/

1640

00.

23530

Masonry in Superstruoture.

40

$420 00.

240.ft.

$30

7150

Coping and Redstones,

Drystone at back of abuts.

10, Foort

660 00.

71

40.

3500 00.

VI

One

60 ft. Girder landed in Kowloon.

One

60 ft. Carriage to sito erection and painting.

500 00.

07

[SA, AL

x at 1

BAC,C

Les act

I>

Ok sex

22

!

TA

01 zaloniynine)

IntoT bagD

Total

Contingincies 10%

Grand Total

20421

2342

00.

10

$25764 60.